Fast-track floor systems in new construction planning

A fast resin is not a fast project route if the surface has not yet been released or other disciplines are blocking the work space. Therefore, plan based on the entire process.
01

Calculate the work space, not one drying time

Include preparation, dust control, primer, intercoats, finishing, curing and transfer. This creates a realistic renovation or completion window.

  • Available temperature and ventilation
  • Residual moisture and age of the substrate
  • Accessibility and internal logistics
  • Moment of mechanical and chemical loading
02

Polyaspartic als snelle afwerkwijze

Polyaspartic systems can be quickly overlaid and loaded and offer choices in uni-color, flakes or broadcast. The exact structure follows from use and desired texture.

03

Work with zones and phases

Divide larger floors into logically transferable work areas. Determine walking routes, temporary separation and connecting seams so that other disciplines can continue predictably.

PROJECTCHECK

Five points to determine in advance.

  1. 01Working window determined per zone
  2. 02Subsurface measurements scheduled
  3. 03Finish and slip level selected
  4. 04Logistics arranged during curing
  5. 05Actual release criteria agreed

Frequently asked questions

Short and technical answers.

Can a fast-track floor be loaded on the same day?

Dat kan bij bepaalde opbouwen en omstandigheden, maar mag nooit generiek worden beloofd. De voor het betreffende project documentatie en temperatuur zijn leidend.

What finishes are possible?

Including uni-colour, flakes, colored quartz and anti-slip, depending on load and cleaning.

VERVOLGSTAP

Apply this knowledge to your project.

Technical and logistics floors

View the building section page.

Open route →

Polyaspartic floor concepts

Compare finishes and markets.

Open route →

Share execution window

Have a fast route preselected.

Open route →
TECHNICAL AUTHORSHIP

PolyShield technical editorial team

Compiled from implementation practice, system documentation and project quality control. The content is brand neutral and intended for professional pre-selection.