Design by use zone
Work with a zone plan instead of one generic floor description. For example, roughness, wear, drainage and visual guidance are selected specifically.
- Lanes and curves
- Ramps
- Parking spaces
- Pedestrian routes
- Technical rooms and entrances
Moisture and planning are selection criteria
Jong beton en tijdsdruk vragen een bewuste primer- en afwerkwijze. Meetresultaten en productvoorwaarden bepalen of applicatie verantwoord is.
Fast-curing 2K and polyaspartic systems can shorten phasing, provided substrate preparation, ventilation and logistics are organised.
Management starts with delivery
Record cleaning advice, inspection points, color zones and repair principles. This gives the owner a floor that remains manageable not only upon delivery, but also during operation.