A specialist scope that fits into your construction planning.

Clear demarcation, release points and implementation phasing for larger waterproofing and coatings packages.Discuss calculation or implementation
BESLISKADER

Four topics that need to be discussed early.

01

Demarcation

Preparation, recovery, details, application and protection are divided between the parties in advance.

02

Construction logistics

Werkvakken, toegang, klimaat en vervolgdisciplines worden gekoppeld aan de aanpak.

03

Inspection moments

Critical layers are checked before they are covered or loaded.

04

Partner coordination

Heavy concrete repair or mechanical preparation can be organized as a transparent partner scope.

Avoid failure costs

Where projects get stuck unnecessarily.

  • Unclear interfaces between subcontractors
  • Unreleased surface at planned start
  • Damage due to subsequent disciplines
  • Product claims without connection to the total structure
INPUT FROM YOUR CONSTRUCTION TEAM

What we need.

  1. 01Drawings, details and work budget
  2. 02Master planning and work compartment division
  3. 03Demarcation list
  4. 04Surface and concrete information
  5. 05HSE and logistical preconditions
POLYSHIELD OUTPUT

What you get back.

  1. 01Scope and interface matrix
  2. 02Work plan and phasing
  3. 03Surface and detail clearance
  4. 04Registration per work area
  5. 05Remaining items and delivery list
PROJECTFASEN

The right technical question at the right time.

01Calculation

What does and does not belong in the specialist scope?

Technical definition with assumptions, quantities and partner scopes.

02Work preparation

What information blocks the start?

Release list for surface, details, access and climate.

03Execution

How do we monitor progress and quality?

Phasing, daily registration and inspection moments.

04Transfer

When is the construction part really ready?

Close residual points, record protection and transfer file.

Relevant work packages

Directly to the appropriate building parts.

NIEUWBOUWSYSTEEM

Balconies & galleries

Efficient serial work with one approved test detail.

View route →
NIEUWBOUWSYSTEEM

Installation roofs

Interfaces with installations require early coordination.

View route →
NIEUWBOUWSYSTEEM

Technical floors

Fast-track systems can support the phase-out planning.

View route →
PURCHASING & EQUIVALENCE

Select by complete value.

  1. 01

    Provide drawings and detailed status with the request.

  2. 02

    Make surface preparation and repair an explicit part of the equation.

  3. 03

    Beoordeel de voorgestelde cure- en vrijgavetijden per project.

  4. 04

    Arrange protection with the right party after our delivery.

Frequently asked questions

Clarity before the application.

Can you, as a subcontractor, accept one complete package?+

Yes, when scope and common ground are clear. Specialist partner work is identified and coordinated transparently.

Do you also do individual small details?+

Not as a separate main activity. Details are carried out when they are part of an appropriate larger construction part or work package.

Can you already think along during the calculation?+

Ja. Met tekeningen, hoeveelheden en planning kunnen we risico’s, aannames en aanpaks vroeg zichtbaar maken.

NEXT STEP

Discuss calculation or implementation.

Start with drawings, construction parts and planning that are already known. A definitive system does not have to be established yet.

Start business intake

Beoordeling in de praktijk

Wat heeft hoofdaannemers nodig om verantwoord te beslissen?

Clear demarcation, release points and implementation phasing for larger waterproofing and coatings packages.

Wanneer dit meestal past

Demarcation

Preparation, recovery, details, application and protection are divided between the parties in advance.

Construction logistics

Werkvakken, toegang, klimaat en vervolgdisciplines worden gekoppeld aan de aanpak.

Inspection moments

Critical layers are checked before they are covered or loaded.

Wat we eerst willen weten

  • Drawings, details and work budget
  • Master planning and work compartment division
  • Demarcation list
  • Surface and concrete information
  • HSE and logistical preconditions

Wanneer we een andere aanpak adviseren

Onduidelijke raakvlakken tussen onderaannemers Niet-vrijgegeven ondergrond bij geplande start Beschadiging door vervolgdisciplines Productclaims zonder aansluiting op de totale opbouw

FROM ORIENTATION TO PROJECT DECISION

Connect to the phase your project is currently in.

You do not have to choose a system or product yet. Start with the information that is already available; we identify what is still technically lacking.