POLYSHIELDSYSTEMSProject bespreken
Large school roof after a white cold-applied 2K polyurea renovation

Polyurea voor uw markt

2K polyurea roof renovation for schools and public-service buildings

A roof renovation that takes into account building use, short implementation windows and administrative accountability.

Launch Roof Intelligence View all systems

For decision makers

Technology translated into building risk and project value.

School boards

Municipalities

Educational foundations

Managers of social real estate

Probleem → gevolg → aanpak

Why standard roof coating is not sufficient as a decision framework.

Aandachtspunt

Limited execution windows

Recovery, drying, weather and safety must fit within the same holiday or usage schedule.

Aandachtspunt

Many users under one roof

Work zones, air intakes, noise, access and emergency routes require prior coordination.

Aandachtspunt

Limited remaining building function

Complete replacement is not always effective when a building is still in use for a defined period.

Technical preselection

Wat we vóór een systeemvoorstel willen weten.

  1. What is the remaining function and use horizon?
  2. Can the existing structure be technically preserved?
  3. Which details require reinforcement?
  4. How are users and installations protected?

Matching system families

Not a universal product
A manageable selection route.

The families mentioned are promising directions. The final construction only follows after checking the substrate, details, load, environment and current technical documentation.

Passende systeemrichting

Conservative renovation of stable existing roof covering

View complete system family ↗
Passende systeemrichting

White waterproofing with lower solar absorption than a dark roof

View complete system family ↗
Passende systeemrichting

Covered waterproofing of balconies and outdoor areas

View complete system family ↗

Projectstrategie

From business context to verifiable execution.

Usage plan

Record school agenda, access, safe zones and installations before the work sequence.

Roof condition

Determining the substrate, moisture, crazing, details and drainage before conservation is recommended.

Phased release

Only close work areas after preparation, primer, reinforcement and membrane have been checked.

Business added value

Waarom opdrachtgevers voor een complete aanpak kiezen.

Practical service-life extension

A suitable roof can be retained without automatically replacing the entire structure.

No open fire

Cold applied systems prevent burner work during membrane application.

Administrative evidence

Photos, scope, consumption and project boundaries support management and accountability.

Evidence after execution

What should be included in the project file.

Own reference project of approximately 700 m²

Six photographically recorded work phases

Established primer, reinforcement and membrane route

Explicit boundary around thermal claims

View the school roof file

Beoordeling in de praktijk

Polyurea voor onderwijs en maatschappelijk vastgoed: alleen waar de toepassing klopt.

De snelheid en taaiheid van polyurea zijn waardevol, maar niet iedere ondergrond of situatie vraagt om hetzelfde systeem. Een praktisch voorstel begint daarom bij de belasting, de details en de beschikbare uitvoeringstijd.

Wanneer dit meestal past

Limited execution windows

Recovery, drying, weather and safety must fit within the same holiday or usage schedule.

Many users under one roof

Work zones, air intakes, noise, access and emergency routes require prior coordination.

Limited remaining building function

Complete replacement is not always effective when a building is still in use for a defined period.

Wat we eerst willen weten

  • What is the remaining function and use horizon?
  • Can the existing structure be technically preserved?
  • Which details require reinforcement?
  • How are users and installations protected?

Wanneer we een andere aanpak adviseren

We kiezen geen product voordat ondergrond en details zijn beoordeeld, doen geen prestatiebelofte zonder passende systeemopbouw en plannen de uitvoering pas wanneer bedrijfsgebruik en bereikbaarheid duidelijk zijn.

Frequently asked questions

Short answers for technical decision makers.

Can a school roof be renovated during a holiday?+

This can often be planned, but only when the extent of recovery, drought, weather windows, access and application conditions have been realistically determined in advance.

Is a white polyurea roof guaranteed to make the building cooler?+

A light finish absorbs less solar heat. The actual indoor temperature also depends on insulation, ventilation, installations and use.

Is complete roof replacement always necessary if there is crackle?+

No. First it must be determined whether the existing layers are stable, dry and adhesive enough for a conservation system renovation.

NEXT STEP

Start with construction data, not with a product choice.

Share location, roof structure, size, reason and available images. You will receive an initial route for assessment without having to re-enter the same data.

Launch Roof Intelligence Share your project data immediatelyFirst consult by telephone or via WhatsApp